HEYI supplied outdoor split-core CTs for the Busan-Gimhae Light Rail project in South Korea. CT were installed in station AC Distribution Cabinets. This case helps buyers get the Outdoor Split-Core CT for Light Rail and prepare RFQs.

1. Where Were the Outdoor Split-Core CTs Installed?
1.1 Busan-Gimhae Station AC Distribution Cabinets
In the Busan-Gimhae project, HEYI's outdoor split-core CTs were installed in station AC distribution cabinets. In the case of similar projects, buyers must identify the cabinet, the layout of the drivers and the available space before choosing the TC.
1.2 AC or DC Circuit Identification
Conventional TC inductions measure alternating current and not direct current. Check if the target is an AC or fixed current distribution circuit and define the voltage, current, and frequency.

2. Which CT Specifications Should Buyers Confirm?
2.1 Current Ratio, Output, and Burden
The RFQ for a light rail must indicate the initial current, the required secondary output, the accuracy class, and the connected meter or transmitter. The CT ratio and the rated load must be adapted to the actual circuit and the measuring device.
2.2 Metering or Protection Duty
Confirm the accuracy class for the measurement. For protection emitters, indicate the emitter model, protection class, load and emergency current conditions.
2.3 Environmental and Mechanical Requirements
Confirm the size of the guide, window dimensions, working temperature, cable distance and required compliance documents. Defines the environmental protection requirements of the facility in the RFQ.
3. Why Choose Outdoor Split-Core CTs for Light Rail Panels?
The Outdoor Split-Core CT for Light Rail is tightened around the existing conductor without removing the base cable, subject to on-site safety procedures. Buyers should verify the box and installation requirements for each premises.
4. What Information Should Be Included in the RFQ?
4.1 Drawings and Existing Product Details
Provide a line diagram or an existing CT part number and a data sheet. A drawing or image can explain the details of the installation.
4.2 Electrical and Commercial Requirements
5. How Can Buyers Request a Quotation from HEYI?
HEYI completed the externally shared CT core delivery project for the Busan-Gimhae Light Railway. For the Outdoor Split-Core CT for Light Rail, send a line outline, specifications, and estimated quantity to heyi@heyiele.com Verification and citation.
Compay: WENZHOU HEYI ELECTRICAL CO.,LTD
Brand: HEYI/ASCT
Contact: Bethy
E-mail: heyi@heyiele.com
Tel: 86-13968747975