Additional requirements for Current Transformers

Views : 874
Update time : 2024-08-05 08:50:58
3.4.205  
instrument security factor 
ratio of rated instrument limit primary current to the rated primary current 
Note 1 to entry: Attention should be paid to the fact that the actual instrument security factor is affected by the burden. When the burden value is significantly lower than  rated one, larger current values will be produced on the secondary side in the case of short-circuit current. 
Note 2 to entry: In the event of system fault currents flowing through the primary winding of a current transformer, the safety of the apparatus supplied by the transformer is at its highest when the value of the rated instrument security factor (FS) is at its lowest. 
[SOURCE: IEC 60050-321:1986, 321-02-28, modified notes to entry]  
3.4.206  
secondary limiting e.m.f. for measuring current transformers 
product of the instrument security factor FS, the rated secondary current and the vectorial sum of the rated burden and the impedance of the secondary winding  
This method will give a higher value than the actual one. It was chosen in order to apply the same test method as 
used for protective current transformers. Refer to 7.2.6.202 and 7.2.6.203.  
[SOURCE: IEC 60050-321:1986, 321-02-31, modified title, synonym and note to entry]  
3.4.207  
rated accuracy limit primary current 
value of primary current up to which the current transformer will comply with the requirements for composite error 
[SOURCE: IEC 60050-321:1986, 321-02-29]  
3.4.208  
accuracy limit factor 
ratio of the rated accuracy limit primary current to the rated primary current  
[SOURCE: IEC 60050-321:1986, 321-02-30]  
3.4.209  
secondary limiting e.m.f. for protective current transformers 
product of the accuracy limit factor, the rated secondary current and the vectorial sum of the rated burden and the impedance of the secondary winding
3.4.210  
saturation flux 
maximum value of secondary linked flux in a current transformer, which corresponds to the magnetic saturation of the core material 
Note 1 to entry: The most suitable procedure for the determination of the saturation is given with the d.c. saturation method described in 2B.2.3. 
Note 2 to entry: In the former standard IEC 60044-6, it was defined as a knee point value, which characterized the transition from the non-saturated to the fully saturated state of a core. This definition could not gain acceptance because the saturation value was too low, and led to misunderstandings and contradictions. Therefore, it was replaced by it which defines the condition of complete saturation. 
3.4.211  
remanent flux   
value of secondary linked flux which would remain in the core 3 min after the interruption of a magnetizing current of sufficient magnitude to induce saturation flux
3.4.212  
remanence factor 
ratio of the remanent flux to the saturation flux, expressed as a percentage   
3.4.213  
secondary loop time constant 
value of the time constant of the secondary loop of the current transformer obtained from the sum of the magnetizing and the leakage inductances and the secondary loop resistance 
3.4.214  
excitation characteristic 
graphical or tabular presentation of the relationship between the r.m.s. value of the exciting current and a sinusoidal voltage applied to the secondary terminals of a current transformer, the primary and other windings being open-circuited, over a range of values sufficient to define the characteristics from low levels of excitation up to 1.1 times the knee point e.m.f. 
Related News
Read More >>
Where Is the HK-58 Current Transformer Used in Malaysian LV Projects? Where Is the HK-58 Current Transformer Used in Malaysian LV Projects?
Sep .28.2026
HK-58 current transformer is designed for Malaysian LV switchboards, busbar panels and energy monitoring upgrades, enabling easier current measurement in factories and commercial buildings without major wiring changes.
Together Under the Same Moon: Celebrating Mid-Autumn Festival with Our Team Together Under the Same Moon: Celebrating Mid-Autumn Festival with Our Team
Sep .24.2026
HEYI celebrates the Mid-Autumn Festival by preparing thoughtful gifts for employees, expressing appreciation for their dedication, teamwork, and contribution while highlighting a warm and people-centered company culture.
Where Is the LMK5-100 Current Transformer Used in Australian Electrical Projects? Where Is the LMK5-100 Current Transformer Used in Australian Electrical Projects?
Sep .18.2026
Explore where the LMK5-100 current transformer is used in Australian switchboards, energy meters, busbar systems, factories, solar projects and infrastructure for accurate high-current energy monitoring.
Where Is a Current Transformer Used in South Africa’s LV Electrical Projects? Where Is a Current Transformer Used in South Africa’s LV Electrical Projects?
Sep .14.2026
Discover where a current transformer can be used in South Africa’s LV projects. Learn how DP-23 supports electrical panels, energy meters, motors, HVAC, and LV busbars with split-core installation, flexible ratios, and easy retrofit.