WENZHOU HEYI ELECTRICAL CO., LTD. delivered shared core external current transformers for a railway project in South Korea. The Outdoor Split-Core CT for Light Rail helps engineers add current measurements to existing variable circuits. These applications show where this approach can contribute to rail performance monitoring.
1. Which stations use surveillance?
1.1 Lighting and service support
A split-core CT for light rail station power monitoring can be measured by an individual variable donor, lighting, signals, or other loads provided by the station. Current trends indicate changes between operating hours. In combination with a measuring device that also measures voltage, the data can support energy analysis; Electricity itself does not measure energy consumption.
1.2 Ventilation, pumps and stairs
The railway auxiliary power monitoring CT can accompany the workflow in the memories of the selected motors. Engineers can compare trends in aeration load, evacuation pumps or stairs and study exceptional changes. Current data show that the load has changed. Finding the cause requires team control.

2. Where does an external project help?
2.1 AC Outdoor Cabinets
The outdoor current transformer for railway AC distribution can monitor the performance of cabinets or outdoor lighting. Identify the AC conductor and check the mounting distance, rain, condensation and closure of the secondary cable. Weather protection should cover the entire installation, including its connections.
2.2 Shops and entertainment areas
Storage appliances may provide workshop material, ventilation, and interior patio lighting. Measuring the selected variable circuits helps teams compare load schemes.The Outdoor Split-Core CT for Light Rail can be adapted to existing guidelines when windows, mounting position and environmental protection are adapted to the location.

3. How to adapt to an existing surveillance system?
3.1 Modernization around the Guide
The retrofit current transformer for existing railway feeders opens around a single cable or band, avoiding having to be threaded by a closed CT. Qualified personnel must continue to comply with space insulation and electrical safety procedures.
3.2 Interface between Pomaru and SCADA
A conventional Outdoor Split-Core CT for Light Rail measures alternating current and provides a secondary signal to a compatible measuring device or processor. This device can send data to SCADA. The CT cannot measure direct current or communicate digitally. The standard network frequency in Korea is 60 Hz; confirm the CT ratio, counter input, and secondary load for each circuit.

4. What does HEYI need for project verification?
4.1 Measurement and installation details
It sends a line diagram, which determines the circuit, voltage, normal current and peak current, conductor size, cabinet conditions, meter input, and cable length. Determine whether the task is load monitoring, energy measurement, or protection.
4.2 Evaluation of the Engineer
From its Korean railway project, HEYI can perform an Outdoor Split-Core CT for Light Rail relative to the actual variable circuit analyze and propose a configuration for technical evaluation.